Amec Foster Wheeler/Detour Gold Corporation

DETOUR LAKE MINE 13.8KV SUBSTATION INSTALLATION – COCHRANE, ON

TESC was responsible for the erection/construction of a 13.8 kV electrical substation at Detour Lake Mine northeast of Cochrane, Ontario.  This project included the following: backfill and final grading; grounding system; installation of buildings, steel structures and miscellaneous steel; equipment installation; bus work and o/h constructors, insulators and lighting protection; cable trays and conduit (including hardware); medium and low voltage cable accessories; metering cabinets, junction boxes, protection, control panels and lighting; fiber optics, communication cable and acc., telecommunications panels; fences and gates; and bollards – oil water separator. Respecting all safety requirements, the project was completed in August 2012, on time and on budget.

In-house Services Rendered

Civil

Electrical