Domtar
Espanola Mill,
Espanola, Ontario
TESC was employed by Domtar to supply all labour, material, and equipment for the demolition, material supply/fabrication, and installation of the piping systems and removal of existing piping system to allow for routing of 2.5 configuration piping system at the Espanola Mill, in Espanola, Ontario.
The TESC team effectively executed the demolition, which included removal and/or temporary modifications of all existing piping, structural steel, and existing equipment required to accommodate the scope of work. The team then performed all associated structural, piping, mechanical, and engineered scaffolding installations.
Specifically, TESC was responsible for the following:
TESC completed this work during a critical mill outage as part of Domtar’s 2.5 single line configuration and modernization project. TESC worked with Domtar to complete the scope during the planned outage duration.
The project was successfully completed without injuries during the COVID-19 pandemic.