Mining and Metals
Harte Gold Corp.
White River, Ontario
TESC was selected as the contractor for the construction of the processing systems for Harte Gold Corporation’s Sugar Zone Mill Installation SMPEI Project located in a remote area near White River, Ontario.
The project comprised the construction of the internal structural, mechanical, platework, and electrical and instrumentation for equipment/components in the mill, and installation of a crushing plant, belt feeders, conveyors, and thickener outside of the mill. Additionally, the work included constructing within a pre-engineered building with specific ties into existing columns. TESC administered all aspects of project management including planning, reporting quality management, safety management, environmental management, resource management and construction management.
The TESC Team was responsible for the following:
A portion of the installation works was performed during the winter months, where the TESC team demonstrated their familiarity with construction under harsh weather conditions and ensured quality standards and requirements were met. The project was completed on time and on budget with no recordable injuries. The TESC team worked diligently to adhere to all safety requirements and to realize the proposed schedule and financial plan.
More Projects