Acting as General Contractor, TESC completed the C120 Substation installation at Young Davidson Mine in Matachewan, Ontario for Northgate Minerals (now Alamos Gold Inc.). 

This project included the supply and install of the substation grounding system; the receipt, lifting and setting of electrical equipment and building modules in substation; the design, supply and install of switchyard bus work; the supply and placement of back fill from the rough elevation; the installation and connection of cable raceway and all exterior cables; the connection of 115kV transmission line; the connection of two 15kV distribution lines; emergency generators; substation building – reconnection of all cables, equipment and support items required to make building functional; supply and installation of exterior lighting; supply and installation of fencing; supply, installation and commissioning of telephone lines; commissioning of substation; relay programming and additional cable in substation. 

This project was completed on time and on budget, with zero lost time injuries.

More Projects

Barrick Hemlo Cyanide Detox Plant & Tailings Flotation Complex
Glencore Onaping Depth Project Headworks Steel Installation
CKPI Installation of Chip Thickness Screening System
Domtar Power Recovery Boiler Chemical Treatment
Domtar HD Tower Piping
Coniston Generating Station 22kV-44kV Conversion
Mistinikon Lake Replacement of Spillway Guardrails and Flashboards
McVittie Generating Station Roof Replacement
Detour Gold Corporation Detour Lake Mine 13.8kV Substation Installation
BHP Billiton Jansen Mine Freeze Plant Supply Installation
Detour Gold Corporation Detour Lake Mine Concrete Slabs
Northgate Minerals Young Davidson Mine Headframe Construction
BHP Billiton Jansen Mine Hoist House Buildings
Vale No.8 Converter Installation
Sudbury INO Process Gas Project, Phase I
Mosaic K3 Mine Service Shaft Headframe Construction
Vale No.10 Converter Installation
Vale Matte Sep SMPEI Phase 2
Vale Matte Sep SMPEI Phase 1
Harte Gold Sugar Zone Mill Installation SMPEI Project
Tahoe Bell Creek Shaft Sinking Project
Sudbury Lime Plant Electrical Services Installation
Glencore Concentrate Unloading

Our portfolio

Project highlights showcasing TESC’s capabilities, problem solving, and leadership across industries.